• Basic Information

  • Gender
    Not specified
  • Birthdate
    21. 04. 2021
  • About me
    Product description
    The machine is mainly applied for the filling of beverage. Integrating with washing, filling and sealing, it realizes full automation in the whole process, suitable for polyester bottle and plastic bottle filling of mineral water and purified water. The bottle types applicable for various parts are easily, conveniently and rapidly adjustable.
    The input bottle adopts air conveying device; the output bottle adopts adjustable speed way, which combines with the transducer of the host machine making the output bottle running more stable and reliable. The photoelectrical inspection of the running condition of various parts makes a higher automation and convenient operation. It is the ideal first-choice equipment of beverage manufacturers.
    Rinsing Parts
    The gripper is made of stainless steel, the position where hold the bottleneck is also made of stainless steel, compared with the traditional rubber gripper, it is much hygiene, durable, and no quick-wear parts, the screw parts of the bottleneck can avoid being polluted by the rubber gripper.
    Filling Part
    The design of filling structure is reasonable and hygiene dead angle, the run of equipment is stable, it can control the material from the bottleneck, the control accuracy is within 卤 2mm (subject to bottle design). The filling valve material is SUS304. The filling system has liquid level automatic control. Filling valve lift is controlled by the valve elevator, after filling valve contact the bottleneck, it start to fill. Bottle is conveying by the wheel in the filling part.
    Capping Part
    Place and capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping
    All 304/316 stainless steel construction
    No bottle no capping
    Automatic stop when lack of bottle
    Capping effect is stable and reliable, Defective rate 鈮?.2%
    Related Products
    Water treatment system
    Raw water tank--- Raw water pump--- Quartz sand filter--- Active Carbon filter--- Sodium filter---Precise filter--- Reverse Osmosis--- Ozone sterilizer--- UV sterilizer--- Pure water tank
    Auto PET bottle blowing machine
    Parts configuration list
    AccessoriesBrand銆丷egion
    PLC controllerXINJIE, China
    touch screenXINJIE, China
    CylinderSMC, Japan
    filterTPC, Korea
    Solenoid valveTPC, Korea
    photoelectric switchOMRON, Japan
    ContactorSchneider, France
    Proximity switchSICK , German
    sensorOMRON, Japan
    switch power supplyMEANWELL, Taiwan
    main servoXINJIE, CHINA
    loading servoXINJIE, CHINA
    Sleeve label machine
    Function: Sleeve the labels into the bottles, and then with the conveying belt the bottles will pass through the steam tunnel, the labels will be shrinked.
    Heat Shrink film packing machine
    Machine components
    Frequency converterSiemensGERMANY
    PLCSiemensGERMANY
    Touch screenSiemensGERMANY
    ContactorSchneiderFRANCE
    RelaySchneiderFRANCE
    Air switchSchneiderFRANCE
    Photoelectric switchAutonicsSOUTH KOREA
    Proximity switchAutonicsSOUTH KOREA
    Cylinder and solenoid valveAirTACTAIWAN, CHINA
    Pneumatic systemSMCJAPAN
    Delivery date and payment method
    1. Delivery date: After the contract is effective and 30% of the total contract amount is received, the delivery is usually within 60 working days
    2. Payment method: 30% of the total amount of the down payment contract is the effective date of the contract. Before the supplier ships the goods (after the buyer has inspected the goods at the supplier's site), the buyer will pay 70% of the payment, and the equipment will leave the factory. Before the suppl technician arrives at the demand side, water, electricity, gas, bottles, caps, labels and supporting facilities are in place.
    Technical Services
    1. Installation, commissioning
    鈼?After the equipment is delivered to the user's workshop, the user should position the equipment in accordance with the provided floor plan.
    鈼?The company will send experienced technicians to guide the installation, commissioning and trial production of equipment.
    鈼?Our company will adjust the equipment to the design capacity within the planned time, the entire line acceptance production capacity is not less than 86% of the design capacity.
    鈼?During commissioning, the company is responsible for providing corresponding spare parts and accessories free of charge. The buyer shall be responsible for the board and lodging expenses of the commissioner.
    2. Staff training
    鈼?Our company is responsible for providing free technical training to the buyer. The training content includes equipment structure and maintenance, equipment control and operation, etc.
    鈼?Training can be carried out at the buyer鈥檚 site. Our company will appoint qualified technical personnel for guidance and formulate corresponding training programs.
    鈼?Through training, the customer鈥檚 technical personnel should be able to master the relevant operation and maintenance skills, adjust the process more proficiently, and handle various failures in a timely manner;China Water Bottling Line
    website:http://www.asfilling.com/water-bottling-line/